UK cost guide

Air Source Heat Pump Cost UK

Understand the main cost components of an air source heat pump installation in the UK.

Last reviewed: 1 September 2026 · Sources & data · Methodology

Typical planning cost£8,000–£16,000
Broader project range£7,000–£25,000+
Planning figures are estimates rather than quotations. Live calculators combine dated UK benchmarks with clearly separated modelling assumptions such as region, size, condition and specification.

Calculate this project

What affects the cost?

Heat-pump budgets depend on heat-loss calculations, emitter upgrades, cylinder requirements, electrical work and the complexity of the existing heating system.

  • Property heat loss
  • Heat-pump output
  • Cylinder and controls
  • Radiator or underfloor upgrades
  • Electrical work
  • Existing system removal

Typical cost breakdown

Heat pump & core equipment40–55%
Installation labour20–30%
Cylinder, emitters & controls15–30%
Electrical & ancillary work5–15%

Regional planning examples

The examples below apply our published modelling factor to the same national benchmark. They are not claimed as observed city-wide average quotes.

London£10,250–£20,500
Manchester£7,500–£15,050
Birmingham£7,850–£15,700
Glasgow£7,600–£15,200
Cardiff£7,300–£14,550

Sources used for this guide

Checkatrade

Air Source Heat Pump Costs in the UK 2026

Published / checked: May 2026

Used for: Air-source heat pump equipment and installation benchmarks

View source ↗
Checkatrade

Ground Source Heat Pump Cost: 2026 Price Guide

Published / checked: August 2026

Used for: Ground-source heat pump installation benchmarks

View source ↗
GOV.UK

Boiler Upgrade Scheme — What you can get

Published / checked: Current at September 2026

Used for: Boiler Upgrade Scheme grant values

View source ↗
GOV.UK

Boiler Upgrade Scheme — Overview and eligibility

Published / checked: Current at September 2026

Used for: England and Wales scheme coverage and eligibility notes

View source ↗

Frequently asked questions

Should grants be deducted from the headline installation cost?

For transparent budgeting it is better to show the gross installed cost first, then show any confirmed grant or support separately because eligibility and scheme terms can change.

Related costs